Budget Homes in Model

Snow

HOMR Builders and Developers offer Low Cost Construction, and Economy Cost Construction in Model

HOMR Civil Contractors , offers from Start to End solutions, these include designing, planning, executing the project. HOMR Builders and developers offer Construction, Renovation & Interiors designs for Apartments Construction, Homes Construction, and hotels Construction, restaurants Construction, Hospitals Construction, Clinics Construction, Offices Construction, and Malls Construction in Model.

Economy Cost of Construction in Model

Low Cost Construction Cost Calculator

 

Select Package:

Area in Square Feet. :

 

Total Cost :

Rs. {{ selitem.id * num2 }}

Concrete Structure :
(Steel, Sand, Cement, Ground & Labour)

 

Rs. {{ selitem.id * num2 * 27 /100 }}

Brick Work – Walls :
(Bricks, Sand, Cement & Labour)

 

Rs. {{ selitem.id * num2 * 26 /100 }}

Electrical & Plumbing :
(Material & Labour)

 

Rs. {{ selitem.id * num2 * 16.5 /100 }}

Doors & Windows :
(Material & Labour)

 

Rs. {{ selitem.id * num2 * 5 /100 }}

Flooring :
(Tiles, Cement, Sand & Labour)

 

Rs. {{ selitem.id * num2 * 13 /100 }}

Painting & Finishing :
(Material & Labour)

 

Rs. {{ selitem.id * num2 * 10 /100 }}

Fabrication & Glass :
(Material & Labour)

 

Rs. {{ selitem.id * num2 * 3.1 /100 }}

Economy Construction Cost Specifications: The of Economic construction does not much change when it comes to structures like the Foundation, basement work, foundation part for raising walls, Columns, beams, generally these structures need to be made with robust and sturdy concrete and good grade steel, as these decide the longevity of the Constructed Structure. The place were we can conserve money without much compromise on quality would be on selection of tiles, flooring materials, paints, electrical fixtures, plumbing fixtures and last but not the lease reducing the cost of interior designing by selecting a simpler design.

A Note about Approval Fees

As it goes without saying that any home building project is to be approved by various Govt Bodies or Organizations, one must get clear cut permission, for plan approval, Electric connections, Drain or sewerage permission.

About construction Material Cost

This part of the construction is the major part, one must take the advice of experts in this field, as the proportion in which Cement, sand, and gravel are mixed can affect the quality of the construction, the strength of the constructed structure also depends on Curing time of the structures.

Note on Transport & cost Variation with height and Handling:

One must take a proper note on the cost of construction as it can vary based on the height of construction being done, as the number of floors increase for construction, the cost proportionately increased by a small faction,

A look at Labor and Supervising Charges

Labor cost starts right from the beginning of the construction process, from marking, digging, pits for basement structures and pillars, columns and to the completion of the entire construction activity.